Gilon Tunnel

A joint venture of Denya Group and CCECC, for the the construction of two tunnels. This is the third section of four-sectioned Akko-Carmiel railway.

A joint venture of Denya Group and CCECC, for the the construction of two tunnels. This is the third section of four-sectioned Akko-Carmiel railway. Project scope: two parallel tunnels 4.6 km long, connecting tunnels, open rail sections to the west and the east, retaining walls and front walls, service roads and pump station.

Contact us