Geophysical Institute of Israel, Lod

This 5-level office building was constructed using prefabricated elements (basement + entrance floor). The project is located in the "Keshev" complex in Lod.

The project was executed in cooperation with “Electra” company that carried out the installation of electro mechanical, HVAC and plumbing systems.
Total project area: 8500 sq.m.

Contact us